CWEE - Mike Weitzel, President, ME, CEI
🗲 Providing High-Quality Electrical CEU Training
🗲 Electrical Engineering Consulting
🗲 Electrical Contracting
🗲 Se habla espanol. (Mas a Menos)
Electrical Consulting



CWE - Central Wahington Electrical Consulting
offers these Engineering Consulting Services:

 


Here, in Richland, Kennewick, Pasco, in the State of Washington, and Nationwide

Mike has worked 16 years in Electrical Engineering on Nuclear Projects performing electrical design, assisting other engineers to resolve design, NEC, commissioning, and maintenance issues, electrical field evaluation of electrical equipment with UL, performing constructability reviews, review and approval of engineering documents, performing design work, leading a UL 508A Industrial Control Panel Shop, resolving electrical engineering issues, and providing training on the NEC for engineering groups. Quality Control and Electrical Inspection to support Fee Milestones. He has years’ of experience writing or co-Approving Engineering Plans,  Engineering Technical Reports, and Safety Documents for Nuclear sites.

 

1.      Electrical Engineering Consulting. Readily Available. NEC. NRTL, DOE, L & I issues

 

2.      Electrical Engineering Support:

a.      NEC Code Compliance. Mike is an NEC SME.

b.      NEC Code Training to Engineering Personnel

c.      NFPA 70E Electrical Safety SME

d.      Electrical Design / Layout. NEC Compliance Constructability Reviews. Saves Rework! (Office & Field)!

e.      Electrical QC – Quality Control

f.        Electrical Inspection by a Master Certified, Experienced, Qualified, Electrical Inspector.

g.       Mike has been the Authority Having Jurisdiction – AHJ. He is experienced in the Approval process!

 

3.        Ability to mobilize and respond quickly to support your needs, and travel to job site to perform the work task required for tasks such as Supplier Quality or NEC / NRTL UL Evaluation of equipment before shipment.

4.        Field Walkdowns of electrical equipment and systems at various project stages.

5.      NEC Inspection, make needed corrections, perform UL / NRTL Evaluation of Test Equipment Trailers or sophisticated electronic equipment where no UL listing is available. Then, author reports for DOE and / or AHJ Approval to get test equipment onto site

6.      NFPA 70E Electrical Arc Flash / Arc Blast / Safety Training / Develop Safety Program / Evaluate Workers for compliance with 70E, provide constructive feedback to worker and written report to employer.

 

7.      Strategic Problem Solver. Provide Measurable Results. Identify Issues. Provide actions steps for Resolution.



CalendarElectrifying Issues - Happening Now!About UsContact UsHomeResourcesPhotos


This site powered by Cline Communications
 Share